Multiple models for selection, can be customized according to customer requirements
Email us ([email protected])
DownLoad the Brochure Get The Price NowIn November 2019, the 1500t/d iron ore production line designed and manufactured by Great Wall Machine for Türkiye was successfully put into production, and Great Wall Machine provided the ball mill host and supporting ore loading equipment.
The project is located in the western border of Türkiye. When the subway is rich in mineral reserves, and the iron ore grade is more than 60% -64%. In early 2018, Great Wall Machinery contacted personnel related to earthworks and conducted on-site inspections on both sides. With years of mature experience in the mineral processing industry, it was equipped with a series of iron ore selection production line equipment including ball mills, classifiers, magnetic separators, etc. The main machine and supporting equipment were conservatively estimated to achieve a daily output of 1500 tons of iron ore selection